
Kalorindo Involvement in a Renewable Energy Project
Lahendong – The 500 kW ORC power plant.
Developed by GFZ Helmholtz Centre Postdam (Germany) and Badan Pengkajian dan Penerapan Teknologi (Agency for the Assessment and Application of Technology – BPPT) has successfully commissioned in September of 2017. Kalorindo a partner for GFZ and BPPT has contributed for manufacturing the primary heat exchanger as well as in charge in the maintenance for the ORC plant. For further reading, you can access the news reported by Alexander Ricter in's
http://www.thinkgeoenergy.com/first-low-temperature-geothermal-plant-commissioned-in-lahendong-indonesia/